ADU Company in Pedley, CA
Kitchen remodeling in Pedley usually means working inside a mid-century ranch house or an older manufactured home on a half-acre-plus lot, where the existing layout rarely matches how families live now. We see a lot of closed-off kitchens that need to open toward the dining area, and older electrical panels that can’t support modern appliance loads without an upgrade. If you’re exploring an ADU and want the kitchen inside the new unit finished by the same crew, or if your main house kitchen needs a full rework, call us at (855) 617-6356 to talk through what’s possible on your lot.
Why Pedley Homes Are Different
Pedley is unincorporated Riverside County, which changes how permits work. Every kitchen remodel that touches framing, electrical, plumbing, or gas lines runs through County of Riverside Planning and Building & Safety review rather than a city hall counter. That’s a different process than neighbors in Jurupa Valley or Eastvale deal with, and it rewards a contractor who files county paperwork regularly. We’ve pulled county permits for kitchen work in Pedley since 2016, so the review timelines and inspection sequencing aren’t surprises to us.
The housing stock tilts older and rural. We’re typically inside a 1960s or 1970s ranch with original single-pane windows, a small galley kitchen, and an electrical service that was sized for a different era. Some homes north of Limonite Avenue are on septic rather than sewer, which matters when you’re reconfiguring drain lines or adding a pot filler. The heat is the other constant. Summer design temperatures in the 100s mean ventilation matters almost as much as the cooktop, and we specify range hoods and makeup air strategies that actually move heat out of the room rather than recirculating it.
Our Main Pedley Services
Most Pedley homeowners reach out to us for two things: building a new ADU on their rural parcel, or remodeling a bathroom that’s showing its age. Here’s what each one looks like in Pedley specifically.
ADU Builders in Pedley
Half-acre and larger lots in Pedley give you room for a detached ADU that simply won’t fit on a standard tract lot in Jurupa Valley. Because this is unincorporated county land, your project runs through County of Riverside review, including CAL FIRE/Riverside County Fire for access and hydrant clearance. We work with prefab brands like Abodu and Dvele, handle Tuff Shed conversions, and manage site-built projects from foundation to finishes. ADU Builders in Pedley covers the full scope, including how horse-property zoning affects where your unit can sit.

Bathroom Remodeling in Pedley
Older Pedley homes often have one small bathroom with original tile and a tub that’s seen fifty years of use. Remodeling here usually means correcting water-damaged subfloor, replacing galvanized supply lines, and reworking the vent stack to meet county code. Our team handles the full gut and rebuild, from rough plumbing to final trim. Bathroom Remodeling in Pedley has the details on typical bathroom timelines and what county inspections your project will need.

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Pedley
Kitchen remodeling in Pedley is almost always a story about undoing fifty years of piecemeal updates. The original ranch-era kitchen was built small, closed off, and wired for a refrigerator, a range, and not much else. Now you want an island, a double oven, a vented hood that actually exhausts, and enough counter space to feed a multigenerational household. The good news is that Pedley’s larger lots give us room to bump out walls or repurpose an adjacent utility room without fighting a tight side-yard setback. The work is part of our full-service scope, and you can see the broader approach on our Kitchen Remodeling page.
We also see a second pattern in Pedley: the ADU kitchen. When families add a detached unit for parents or rental income, the kitchen inside that ADU needs to be compact, durable, and sized for one or two people, not a five-person household. We build both types, and we’ll match the approach to your lot, your septic capacity if applicable, and what the county will approve without a variance.
Full Gut and Reconfiguration
Signs you need it
You can’t open the refrigerator and the dishwasher at the same time, the layout dead-ends at a wall that should be open, or you’re storing pans in the dining room because every cabinet is full.
What it costs in Pedley
A full kitchen gut and reconfiguration in Pedley typically runs $35,000 to $65,000 depending on the plumbing moves, appliance count, and whether we’re removing a load-bearing wall.
How we do it
We strip the room to framing, move the plumbing and electrical to match your new layout, patch and level the floor, then rebuild with new cabinets, counters, appliances, lighting, and a properly vented hood.
Cabinet and Counter Renewal
Signs you need it
The cabinet boxes are solid but the doors are delaminating, the counter has burn marks or cracked seams, and you want a fresher look without tearing the whole room apart.
What it costs in Pedley
Walnut cabinet refacing and new countertops in Pedley generally come in between $12,000 and $25,000 depending on material and lineal footage.
How we do it
We measure every cabinet face, order or fabricate the doors and panels, install new hardware, pull the old counters, and set the new stone or quartz with seams placed away from high-traffic areas.
What Kitchen Remodeling Costs in Pedley
| Item | Typical range in Pedley |
|---|---|
| Full kitchen gut and reconfiguration | $35,000 – $65,000 |
| Cabinet refacing and new countertops | $12,000 – $25,000 |
| Island addition with plumbing and electrical | $8,000 – $18,000 |
Septic location, electrical service upgrades, and the condition of the original subfloor are the three biggest price movers on Pedley kitchen jobs. We write line-item quotes and hold to the number unless you change the scope mid-project.
Can you match the kitchen style to my Pedley ranch house?
Yes. We work with the original proportions of your ranch or manufactured home and typically specify James Hardie trim details and period-consistent cabinet profiles so the new kitchen reads as part of the house rather than a showroom transplant.
How long does a full kitchen remodel take in Pedley?
Most full kitchen remodels in Pedley run four to seven weeks from demo to final inspection. County of Riverside inspections between phases can add a few days, and we schedule those as early as the sequencing allows. Call (855) 617-6356 for a timeline specific to your scope.
Brands We Service in Pedley
We work across the full ADU brand spectrum rather than pushing one manufacturer. Our Pedley projects have included Abodu and Dvele prefab units, Cover modular builds, and Tuff Shed conversions finished to county living standards. Our brands page breaks down how each one fits different lot shapes and budgets.
Pricing for ADU Company in Pedley, CA
| Service | Typical range in Pedley |
|---|---|
| Kitchen remodel – full gut and reconfiguration | $35,000 – $65,000 |
| Kitchen remodel – cabinet refacing and countertops | $12,000 – $25,000 |
| Kitchen island addition | $8,000 – $18,000 |
| Bathroom remodel – tub to walk-in shower | $11,000 – $17,000 |
| Bathroom remodel – guest bath update | $8,000 – $14,000 |
| Detached ADU – site-built | $315 – $335 per sq ft |
| Detached ADU – prefab brand unit | $285 – $475 per sq ft |
| Detached ADU – modular | $275 – $365 per sq ft |
| Tuff Shed ADU conversion | $160 – $240 per sq ft |
In Pedley the price usually moves on three things: septic capacity for ADU projects, the condition of the existing structure when converting a barn or shed, and how far the electrical service needs to be trenched across a large rural parcel. We give every homeowner a written, line-item quote before work starts, and we don’t change order you after the fact unless you change the scope.
Neighborhoods We Serve in Pedley
We work throughout the 92509 ZIP code, from the equestrian parcels along Limonite Avenue and the streets south toward the Santa Ana River bottom, to the older residential pockets off Van Buren Boulevard and the horse-property lots near Pedley Elementary. Our typical response for an estimate in Pedley is one to two business days.
- Equestrian parcels along Limonite Avenue
- Residential streets south of Limonite toward the river
- Older ranch lots near Van Buren Boulevard
- Manufactured home parcels off 56th Street
- River-adjacent properties along the Santa Ana bottom
Service Area – Cities Near Pedley
Our service area stretches beyond Pedley into the neighboring communities that share similar housing stock and county-level permit realities. We also serve Glen Avon, CA, Sunnyslope, CA, Rubidoux, CA, and Riverside, CA. If you’re near the county line or on a parcel that straddles two jurisdictions, call us and we’ll confirm which building department reviews your project.
Serving Pedley, CA — Our Local Coverage Area
We’re based in the Pedley area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Pedley
We typically schedule Pedley estimates within one to two business days. The 92509 ZIP code is close to our Home Gardens base, so site visits are usually easy to arrange around your work schedule. Call (855) 617-6356 and we’ll find a time that works.
Yes, for any work that touches electrical, plumbing, gas, or structural framing. Pedley is unincorporated, so County of Riverside Planning and Building & Safety issues the permits and performs the inspections. We pull all permits and schedule every inspection on your behalf.
Yes, and that’s the part of our scope that saves Pedley homeowners the most time. We build the ADU shell and finish the kitchen and bathroom inside it under one contract, one permit package, and one inspection schedule. No second contractor or handoff between trades.
Call Holloway ADU Builders at (855) 617-6356 to schedule a free estimate for your kitchen remodel or ADU project in Pedley. We’ll walk your lot, talk through your options, and give you a written line-item quote before any work begins.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Pedley Customers Say
"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."
— Cole Schaefer"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
— Heather Reed"Every invoice was tied to a completed milestone, so I always knew what I was paying for."
— Justin Kim