ADU Company in Lakeland Village, CA
Kitchen remodeling in Lakeland Village comes with a set of conditions that make it different from a typical Riverside County job. We’re talking about mid-century lake cottages with small footprints, older ranch-style homes on irregular parcels, and newer custom builds on hillside lots above Lake Elsinore. Holloway ADU Builders has served Lakeland Village since 2016, and the kitchens we remodel here tend to share three constraints: limited square footage, outdated utility rough-ins, and heat that punishes poor ventilation. If you’re planning a kitchen remodel or an ADU with a full kitchen, call us at (855) 617-6356 for a free estimate.
Why Lakeland Village Homes Are Different
Lakeland Village is unincorporated Riverside County, so every kitchen remodel and ADU project goes through Riverside County Building & Safety rather than a city permit counter. That alone changes the timeline and the paperwork. But the bigger variable is the housing stock. Many of the lake cottages here were built in the 1950s and 1960s, when kitchens were closed off, electrical services were 60 amps or less, and nobody planned for a hood vent strong enough to handle a hot, dry climate. Those older homes often sit on septic systems, which matters if you’re adding square footage or reconfiguring plumbing lines. Up on the hillsides above the lake, the newer custom homes present a different challenge: wind exposure off the lake in the afternoon and sun that beats on west-facing walls from noon until sunset. We plan kitchens here with heat in mind, from reflective window treatments to ventilation that actually moves air. And because many Lakeland Village parcels are small and irregular, we spend more time on site-specific layout work than we would in a newer master-planned community. Setbacks, lot lines, and existing utility locations can make or break a design.
Our Main Lakeland Village Services
Most Lakeland Village homeowners call us for two things: building an ADU on a lot that qualifies, and remodeling bathrooms in homes that haven’t been updated in decades. Here’s what each looks like here.
ADU Builders in Lakeland Village
Lakeland Village’s unincorporated status means ADU permits run through the county, and many older lake-adjacent lots predate current septic and setback standards. A site visit to confirm sewer versus septic, actual lot lines, and hillside grading is often the difference between a feasible ADU and a dead end. We match homeowners to the right construction method, prefab, modular, or site-built, based on their lot and budget rather than pushing one brand. ADU Builders in Lakeland Village covers the full process, from feasibility to final inspection.

Bathroom Remodeling in Lakeland Village
The bathrooms in Lakeland Village’s mid-century cottages are often original: small, poorly vented, and sitting on cast-iron drain lines that have seen better decades. Remodeling here usually involves more than swapping fixtures. We address subfloor rot, upgrade vent fans to handle humid summers, and reconfigure layouts in spaces that were never designed for modern fixtures. Bathroom Remodeling in Lakeland Village details the process, including what to expect from county inspections on older septic-connected homes.

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Lakeland Village
Kitchen remodeling in Lakeland Village means working around the realities of an older, unincorporated community: mid-century cottages with closed-off floor plans, electrical panels that can’t support a modern appliance load, and summer heat that demands serious ventilation. Homes near the lake and up in the hills both need kitchens designed for airflow and sun orientation, not just aesthetics. Holloway ADU Builders also handles kitchen remodels inside the ADUs we build, so one team manages the structure and the finishes. If you’re comparing approaches, see our Kitchen Remodeling service hub for the full scope.
Full Kitchen Gut and Rebuild
Signs you need it
Your kitchen has original 1960s cabinetry, a layout that walls off the cook from the rest of the house, or wiring that can’t handle a microwave and a toaster at the same time.
What it costs in Lakeland Village
A full gut and rebuild in Lakeland Village typically runs $28,000 to $55,000 depending on structural changes, utility upgrades, and finish selections.
How we do it
We demo to studs, relocate walls if the county approves the structural change, run new electrical and plumbing, insulate for the basin heat, and rebuild with cabinets, counters, lighting, and ventilation installed by our crew.
Kitchen Refresh and Update
Signs you need it
Your cabinets are solid but dated, the counters are worn laminate, and the layout works but the fixtures and finishes drag the room down.
What it costs in Lakeland Village
A refresh in Lakeland Village typically lands between $12,000 and $22,000 for new counters, hardware, lighting, a sink, and cabinet refinishing or refacing.
How we do it
We reface or refinish cabinets, install new countertops in quartz or butcher block, swap the sink and faucet, add under-cabinet lighting, and replace the vent fan with a model sized for the room’s heat load.
What Kitchen Remodeling Costs in Lakeland Village
| Item | Typical range in Lakeland Village |
|---|---|
| Full kitchen gut and rebuild | $28,000 – $55,000 |
| Kitchen refresh and update | $12,000 – $22,000 |
| Appliance package and setup | $4,500 – $9,000 |
Hillside lots with complex sewer tie-ins and older cottages that need an electrical service upgrade will push costs toward the high end of these ranges. We provide written line-item quotes before work starts, and the price we quote is the price you pay.
How long does a kitchen remodel take in Lakeland Village?
A full gut and rebuild takes 6 to 10 weeks depending on county inspection scheduling and whether we’re moving plumbing or walls. Refreshes usually finish in 2 to 4 weeks. Call (855) 617-6356 to get a project-specific timeline during your free estimate.
Will a kitchen remodel in an unincorporated area need county permits?
Yes, Riverside County requires permits for electrical, plumbing, and structural changes in Lakeland Village. We pull all permits and schedule inspections as part of the job. Call (855) 617-6356 and we’ll tell you exactly what your remodel triggers.
Brands We Service in Lakeland Village
We work across the major construction brands and methods, including Abodu, Cover, and Dvele for prefab and modular ADUs, plus James Hardie for exterior cladding that holds up to lake wind and basin sun. We keep relationships with local suppliers so standard parts and cladding arrive quickly. See our brands for the full list.
Pricing for ADU Company in Lakeland Village, CA
| Service | Typical range in Lakeland Village |
|---|---|
| Kitchen gut and rebuild | $28,000 – $55,000 |
| Kitchen refresh | $12,000 – $22,000 |
| Appliance package and setup | $4,500 – $9,000 |
| ADU feasibility and site assessment | $450 – $900 |
| Prefab ADU (structure only) | $120,000 – $220,000 |
| Modular ADU (structure only) | $140,000 – $240,000 |
| Site-built ADU | $180,000 – $300,000+ |
| Tuff Shed conversion | $35,000 – $80,000 |
| Bathroom remodel | $14,000 – $32,000 |
What pushes prices up in Lakeland Village is usually site-specific: hillside grading, septic system tie-ins, electrical service upgrades on older cottages, and wind-rated structural requirements on exposed lots. Every quote is a written line-item estimate with no change orders, so the number you approve is the number you pay.
Neighborhoods We Serve in Lakeland Village
We work throughout Lakeland Village’s 92530 ZIP, from the flat lake-adjacent parcels to the hillside streets above the water. The older cottage clusters near the lakefront require the most site-specific discovery because utilities and lot lines vary from parcel to parcel, while the newer hillside builds present grading and wind considerations. We typically schedule estimates within a week for Lakeland Village homeowners.
- Lakefront and lake-adjacent cottage streets
- Grand Avenue corridor
- Hillside parcels above Lake Elsinore
- Meadowbrook-adjacent neighborhoods
- Riverside Drive area
Service Area – Cities Near Lakeland Village
Holloway ADU Builders works across the Lake Elsinore basin and the surrounding Riverside County communities. In addition to Lakeland Village, we serve homeowners in Sedco Hills, CA, Canyon Lake, CA, Meadowbrook, CA, and Wildomar, CA. Each area has its own permit path and housing stock, and we navigate all of them daily.
Serving Lakeland Village, CA — Our Local Coverage Area
We’re based in the Lakeland Village area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Lakeland Village
Yes. Every kitchen remodel, bathroom remodel, and ADU we build in Lakeland Village goes through Riverside County Building & Safety. We prepare the plans, submit the permit application, schedule inspections, and close out the permit when the job passes final. You never have to stand at a county counter.
For most Lakeland Village projects, we can begin the feasibility and design phase within two to three weeks of your initial estimate. Construction start dates depend on county permit turnaround, which currently runs longer for hillside and septic-connected parcels. Call (855) 617-6356 and we’ll give you a realistic start window for your specific lot.
We do, and we’ve remodeled kitchens and bathrooms in many of the mid-century cottages near the lake. These homes need extra attention to electrical service size, venting for heat, and often a septic capacity check before we finalize a design. A site visit tells us what’s possible, and estimates are free.
Holloway ADU Builders serves Lakeland Village with kitchen remodeling, bathroom remodeling, and full ADU construction. One team from foundation to finished kitchen. Call (855) 617-6356 to schedule your free estimate.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Lakeland Village Customers Say
"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
— Heather Reed"Every invoice was tied to a completed milestone, so I always knew what I was paying for."
— Justin Kim"Garage conversion to a one bedroom unit. He handled the plans, the city submittal, and every round of corrections. Took six months from first meeting to final inspection and he never once made the permit process my problem."
— Rachel Brooks